Site Plan Requirements

     Building Home

The following information is generally required on a site plan:              

  • Address and/or lot, block and subdivision
  • Front, rear and side property lines, indicating the length and width of the lot.
  • Location, size (dimensions) and use of existing and proposed buildings, include sidewall height of proposed buildings.
  • Distance of property lines from the proposed and existing buildings.
  • Locations of alleys, streets, easements (drainage, utility or walkway), and public right-of-ways. Please label vacated alleys and/or streets.
  • Proposed or existing driveways.
  • Proposed location of sewer lines, water lines, electric and gas meters, sump baskets and drainage lines.
  • Location of utility room.
  • Name, signature and date of person preparing the site plan.
  • Indicate Northpoint.
  • Need 2 set of plans
*After a preliminary review, additional information may be required.
 
 

General Residential Setbacks are on the City Zoning Code – Zoning Code

or contact the Community Development Director at 507-934-0661.