To: Contractor/Builders:

The permit applicant agrees that all work to be done under applied for permit shall comply with all applicable federal, state and city codes, ordinances, rules and regulations. The Department of Public Works must be notified in advance for all required inspections of connections before closing and street restoration. Failure to have the excavation inspected may require the owner’s reopening the excavation for inspection.

An applicant must accept full responsibility for the complete restoration to City specifications of the proposed excavation and surroundings. Contractor will use traffic control devices in compliance with the Minnesota Manual on Uniform Traffic control Appendix B (copies available in the Building Department) for any excavation performed within the city right-of-away to provide optimum safety and convenience for the general public. The contractor for the duration of the project shall maintain these traffic control devices.

Applicant must guarantee all work performed under this contract be done in accordance with the Plans, Specifications, and Special Provisions, and in a good and workman-like manner; and to renew or repair any work which may be rejected, due to defective materials for workmanship, prior to final completion and acceptance of the project, and to renew or repair any work discovered to be defective within one year after said acceptance of the project.

  1. Contractors work must comply with the Federal OSHA Standard 29 CFR 1926-650-652 Subpart P. copies are available at The Building Department Office.

  2. Maintain open excavations within R.O.W. This is the contact person’s responsibility. If the City has to maintain proper surfaces – materials, equipment, and labor charge outs will apply.

  3. We will address problems with individual contractors as they arise. Any questions proper to the project should be addressed to the appropriate personnel from the City of St. Peter.

  4. Please schedule timely street surface repairs. Ten (10) days from initial opening is appropriate.

  5. The Contractor shall maintain open communication lines with the city to ensure proper interaction. That will help all projects to obtain safe, timely completion and satisfactory results. This benefits all parties involved.



Building Department
227 South Front Street
Saint Peter, MN 56082
Phone: (507) 934-0662
Fax: (507) 934-4917
E mail: deanb@saintpetermn.gov